Hi,
When i make a time entry, break 45min, start time 7h and stop time 18h. I have a total duration of 10h15min.
In the report it stats, Start Time 07:00, Stop Time 17:15, Break 0,75 and Duration 10,25.
My question is, is there a way to show the stop time correctly in a report?
Thanks